午夜三级在线观看-午夜色视频-午夜色视频在线观看-午夜色网-国产精品自拍在线观看-国产精品自在线

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://m.sankus.cn

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 国产精品电影一区 | 亚洲第一区精品日韩在线播放 | 亚洲国产第一区二区香蕉 | 99pao在线视频精品免费 | 一区二区三区国模大胆 | 狼人 成人 综合 亚洲 | 亚洲xx网站| 又大又粗又爽黄毛片 | avtom影院永久地址人人影院 | 男同小黄文 | 羞羞答答91麻豆网站入口 | 国语一级毛片私人影院 | 亚洲综合丁香 | 色妞视频资源在线观看 | 四虎在线最新永久免费播放 | 91亚洲视频 | 日本视频www色 | 丁香激情综合网 | 天天舔日日干 | 国产在线一区二区三区四区 | 国产精品资源手机在线播放 | 欧美激欧美啪啪片免费看 | 久久国产精品亚洲综合 | 五月天丁香婷婷开心激情五月 | 久久免费香蕉视频 | 精品视频网站 | 亚洲精品第一 | 亚洲高清视频一区 | 在线久综合色手机在线播放 | 亚洲国产精品自在现线让你爽 | 黄色在线网站视频 | 免费一级欧美片在线观看 | 亚洲美女视频一区 | 国产成年女一区二区三区 | 免费一级大片 | 在线精品91青草国产在线观看 | 国产精品欧美一区二区 | 狠狠色噜噜噜噜狠狠狠狠狠狠奇米 | 免费人成黄页在线观看日本 | 亚洲天堂免费在线 | 失禁h啪肉尿出来高h受 |